NYSERDA Bulk Energy Storage Incentive Program

May 16, 2023

Summary

*As of May 2023, the solicitation is closed.

In December 2018, the New York Public Service Commission (PSC) adopted 1,500 MW energy storage target by 2025, and a 3,000 MW target by 2030. As a part of the order, the PSC directed NYSERDA to develop incentive designed to meet the statewide energy storage goals. 

The Bulk Energy Storage Incentive program offers financial incentives for new energy storage projects greater than 5 MW (AC) that are connected to the grid. The energy storage system must provide services to the wholesale energy market, ancillary services, or distribution level service. 

Eligibility

The projects must be greater than 5 MW (AC). Any energy storage technology including chemical, thermal, or mechanical systems are eligible. These systems can be stand alone projects, or can be paired with another distributed energy resource technology system such as solar PV. Experimental, beta or prototype equipment is not eligible, the system must include manufacture warranty. 

The system must be physically located within the New York state and must be interconnected to the New York's bulk transmission system (NYISO). Projects located within ConEdison's service territory are not currently eligible for the incentive. Projects located in Long Island Power Authority's territory may be eligible for incentive in the future subject to the availability of Regional Greenhouse Gas Initiative (RGGI) funds. 

Additionally, to be eligible, the project must be i) in the stage 9 in the NYISO interconnection queue or later (must have completed feasibility study, and system impact study), ii) demonstrate site control, iii) approval from local authority having jurisdiction. 

Following systems are not eligible for the program - i) that have been involved in the NYISO market prior to March 11, 2019, ii) projects owned by the utility or New York Power Authority, iii) projects receiving other NYSERDA funds, iv) projects that have bulk dispatch rights contract, and iv) projects that receive NYSERDA retail storage incentive. 

The energy storage system must be able to maintain a minimum of 70% round trip efficiency. 

Program description

Project applications will be grated on a first-come, first-served basis. The incentive is awarded at a $/kWh rate for the amount of usable kWh (AC) of installed storage capacity at commercial operation date. Projects only providing energy arbitrage and or ancillary services will receive 75% of the stated incentive. There is no maximum project size, but the NYSERDA award will not exceed $25 million on a single project. 

The incentive is based on the year when the project application is submitted to NYSERDA. The NYSERDA Energy Storage dashboard will provide MWs and MWh committed and remaining funding in the project. 

For projects under 20 MW, the incentives are as follows-

2019 2020 2021 2022 2023 2024 2025
$110/kWh $100/kWh $90/kWh $80/kWh $70/kWh $60/kWh $50/kWh

Projects that are bigger than 20 MW will receive $85/kWh for projects starting in 2019, and $75/kWh for projects to be developed in 2021-2022. 

The incentives must be applied through the project contractor. 

Other NYSERDA resources on energy storage:

1. Battery Energy Storage System Guidebook to develop system planning and inspection processes for local communities. 


Program Overview

Implementing Sector: State
Category: Financial Incentive
State: New York
Incentive Type: Rebate Program
Web Site: https://www.nyserda.ny.gov/All-Programs/Programs/Energy-Storage/Developers-Contractors-and-Vendors/Bulk-Storage-Incentives
Administrator: NYSERDA
Start Date:
Eligible Renewable/Other Technologies:
  • Lithium-ion
Incentive Amount: 2023 incentive levels-
Projects less than 20 MW: $70/kWh
Projects greater than 20 MW: $75/kWh
Maximum Incentive: $25 million per project
Eligible System Size: Minimum of 5 MW
Equipment Requirements: Must include manufacture warranty, must be UL 9540 or CAN 9540 (Standard for Energy Storage Systems and Equipment) certified.

Applicable based on storage type:
UL 1973 (Standard for Batteries for Use in Stationary, Vehicle Auxiliary Power and Light Electric Rail Applications)
UL 1642 (Standard for Lithium Batteries)
UL 1741 or UL 62109 (inverters and power converters)
Installation Requirements: Must be installed within NY state and NYSIO region. Must be grid connected.
Ownership of Renewable Energy Credits: Not applicable

Authorities

Name: Case 18-E-0130 Order Establishing Energy Storage Goal and Deployment Policy
Effective Date: 12/13/2018
Expiration Date: 12/13/2018
Name: Program Manual

Contact

Name: Energy Storage Program Manager
Organization: NYSERDA
Address: 17 Columbia Circle
Albany NY 12203
Email: energy.storage@nyserda.ny.gov

This information is sourced from DSIRE; the most comprehensive source of information on incentives and policies that support renewables and energy efficiency in the United States. Established in 1995, DSIRE is operated by the N.C. Clean Energy Technology Center at N.C. State University.